About the Project

Wind Prospect is in the environmental and planning approvals phase for the development of a renewable energy project located 15 kilometres west of Mortlake, between Hexham, Caramut and Ellerslie

The Hexham Wind Farm is in the environmental and planning approvals phase with preparation of the Environment Effects Statement (EES) currently underway. Subject to approvals, the Project is expected to include up to 106 wind turbines and a Battery Energy Storage System (BESS). 

The Project would be co-located on agricultural land primarily used for sheep and cattle grazing, with some cropping. The Project site was selected due to its reliable wind resource, relatively low population density and proximity to existing transmission infrastructure. An on-site terminal station would be built next to the existing 500 kV transmission line within the Project site, meaning the construction of new transmission lines is not required. This approach helps to minimise environmental impacts while allowing agricultural activities to continue alongside the Project.

Location

The map below shows the current indicative layout of proposed wind turbines for the Project. Turbine locations will be finalised through detailed environmental, cultural heritage, technical and community assessments as part of the Environment Effects Statement (EES).

Project details

Wind by Kawalan Icon from the Noun Project

Up to 106 wind turbines

Estimated 2,559 GWh annual output

Up to 515,000 households annually

Up to 1.88m tonnes of COabated annually

If approved, the Hexham Wind Farm would support Victoria’s clean energy future by supplying renewable electricity to the grid. The Project is estimated to produce around 2,559 GWh of electricity annually. That is enough to power up to 515,000 households and abate 1.88 million tonnes of carbon dioxide each year.

In addition to its energy contribution, the proposed Hexham Wind Farm would deliver economic benefits for the region. It would create local employment opportunities during the construction phase and provide ongoing jobs once operational. The Project would generate opportunities for local suppliers, businesses, trades and service providers. Wind Prospect is committed to using local or regional labour and services where the required skills and expertise are available.

 The Project plans to provide dedicated support for the local community. Hexham Wind Farm currently operates a Community Sponsorship Fund of $20,000 annually. Once operational, this would transition into the Community Benefit Fund, providing on-going annual contributions of up to $106,000 per year, or up to $1,000 per turbine, for local initiatives over the life of the Project.

 

We love supporting local community projects, programs and initiatives. Visit the Community page to see what we’ve sponsored and download our sponsorship application form.  

Project approvals and timeline

Project feasibility

Planning and environmental studies are undertaken and the proposed layout is optimised.

Current - Environment and planning approvals

State and Commonwealth referrals submitted, followed by an EES and planning permit application processes.

2026 - Post planning

Obtain pre-construction approvals, complete detailed design and finalise project financing.

2027-2029 - Construction and commissioning

Procurement and local supplier opportunities, grid connection, construction and commissioning of the wind farm

2029-2054 - Operation and maintenance

A wind farm like Hexham is expected to have an operational life of at least 25 years.

At the end of the Project's life - Decommissioning and rehabilitation

At the end of the Project’s life, the Project owner is responsible for decommissioning the site.

As part of the Victorian Government’s planning and approvals process for major projects, Wind Prospect is preparing an Environment Effects Statement (EES) for the proposed Hexham Wind Farm. An EES is a requirement under the Environment Effects Act 1978 and is overseen by the Department of Transport and Planning (DTP) on behalf of the Minister for Planning.

The purpose of the EES is to carefully assess the potential environmental, social and economic impacts during the construction, operation and decommissioning of the Project. It is a rigorous process that requires considerable research and consultation to ensure that any potential impacts on the local community and environment are understood and mitigated where possible.

In September 2024, the DTP released the final scoping requirements for the Hexham Wind Farm EES. As part of this, a range of detailed studies are being carried out to assess the potential impacts of the Project. These include but are not limited to:

  • Biodiversity and ecology: Assessing the impact on local wildlife, including any risks to protected species and habitat.
  • Water resources: Evaluating potential effects in local water systems, such as wetlands and streams, as well as groundwater.
  • Cultural heritage: Investigating the potential impact on both Aboriginal and European cultural heritage sites.
  • Noise, dust and traffic: Analysing how construction and operational activities might affect local amenity, including noise levels, dust and traffic.
  • Visual amenity: Examining how the wind turbines could alter the landscape and considering measures to reduce visual impacts.
  • Socioeconomic effects: Assessing how the Project could impact local agriculture, the regional economy and infrastructure.
  • Fire risk: Assessing fire risk associated with bushfire and a fire starting within the proposed infrastructure.

The studies aim to identify potential issues and develop strategies to avoid, minimise or manage any adverse impacts on the environment and the social fabric of the community.

Community consultation

Community engagement is an essential part of the EES process and the development of the Project. Wind Prospect is committed to keeping local residents, landowners and other stakeholders informed and involved and aims to continue to do this through:

  • Consultation during preparation: Throughout the EES preparation phase, Wind Prospect is engaging with the community through information sessions, newsletters and one-on-one consultations. This provides opportunities for local stakeholders to raise concerns, ask questions and share their views.
  • Feedback on the EES: Once the EES is prepared, it will be made available to the public for review. This gives the community a chance to formally provide feedback on the findings to the Minister for Planning. Any issues raised in this stage will be carefully considered, and adjustments to the Project will be made if necessary.
  • Ongoing communications: Wind Prospect is committed to maintaining open lines of communication throughout the process to ensure the community remains informed and involved at all stages.

If you have any questions, please don’t hesitate to reach out to the project team.

 

 

 

Wind Prospect Pty Ltd

Working in partnership.
Delivering capacity.

 

PO Box 110

Suite 10, 19-35 Gertrude Street
Fitzroy Victoria 3065

T: +61 3 9005 9075

W: www.windprospect.com.au

 

Contact us

10 + 8 =

© Wind Prospect 2021 | Site by Wordwiz